[Oct 15, 2023] E_S4HCON2023 Exam Dumps 100% Same Q&A In Your Real Exam [Q20-Q35]

Share

[Oct 15, 2023] E_S4HCON2023 Exam Dumps 100% Same Q&A In Your Real Exam

E_S4HCON2023 Test Engine Dumps Training With 78 Questions

NEW QUESTION # 20
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A


NEW QUESTION # 21
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It explains where to find information about the custom code analysis.
  • B. It is a database-specific document.
  • C. It explains the database migration option (DMO) of SUM.
  • D. It contains a section about the simplification item (SI) checks.

Answer: A,D


NEW QUESTION # 22
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

  • A. To optimize the migration
  • B. To optimize the main import
  • C. To optimize the conversion
  • D. To optimize the activation

Answer: A


NEW QUESTION # 23
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

  • A. Downtime Optimized DMO (DoDMO)
  • B. Near-Zero Downtime Maintenance (nZDM)
  • C. Downtime Optimized Data Conversion (DoC)
  • D. Near-Zero Downtime Technology (NZDT)

Answer: D


NEW QUESTION # 24
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:

  • A. Check the most recent entries in SAPup.log
  • B. Check the messages shown by the SUM UI
  • C. Check the most recent entries shown in file sapevt.trc
  • D. Check the system log (transaction SM21) of the SAP system

Answer: A,B


NEW QUESTION # 25
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. During uptime
  • B. During downtime
  • C. During SPDD
  • D. Post-downtime

Answer: A,D


NEW QUESTION # 26
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?

  • A. Using R3load and memory pipes
  • B. Using R3load and network socket connection
  • C. Using R3load and file transfer
  • D. Using work processes and network socket connection

Answer: A


NEW QUESTION # 27
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Perform the migration of data into the new data structure
  • B. Run the database migration to the SAP HANA database
  • C. Check the compatibility of custom code with SAP S/4HANA
  • D. Apply the recommendations of the simplification list

Answer: C,D


NEW QUESTION # 28
Which of the following SUM activities require a stack XML file calculated by the maintenance planner?
Note: There are 3 correct answers to this question.

  • A. SAP S/4HANA conversion including DMO
  • B. Prerequisite check
  • C. DMO without system update
  • D. Benchmark tool
  • E. SAP S/4HANA conversion without DMO

Answer: A,B,E


NEW QUESTION # 29
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for source release, Windows, SAP MaxDB
  • B. Kernel for target release, Linux, SAP HANA
  • C. Kernel for target release, Windows, SAP HANA
  • D. Kernel for target release, Windows, SAP MaxDB

Answer: A,C


NEW QUESTION # 30
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
  • B. Unicode conversion SAP S/4HANA conversion including database migration
  • C. Unicode conversion Database migration SAP S/4HANA conversion without database migration
  • D. Unicode conversion SAP S/4HANA conversion without database migration Database migration
  • E. SAP S/4HANA conversion including database migration and Unicode conversion

Answer: A,B,C


NEW QUESTION # 31
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:

  • A. Move the SAPM update archive into the download folder
  • B. Extract the SAP HANA client installation archive
  • C. Move the R3trans update archive into the download folder
  • D. Move the stack.xml update file into the download folder
  • E. Extract the SAP HANA database installation archive

Answer: A,B,D


NEW QUESTION # 32
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In DMO Migration Preparation
  • B. In SUM Parameters
  • C. In Process Control Center
  • D. In SUM Phaselist

Answer: B,C


NEW QUESTION # 33
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

  • A. MIGRATE J5T_DUR_XML file from a previous run
  • B. Stack XML file calculated by the Maintenance Planner
  • C. Breakpoint configuration file SAPUPPHAS.BRK
  • D. Parameter file SAPup_add.par

Answer: A,B


NEW QUESTION # 34
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

  • A. Check the Charts Control Center in the SUM Ul
  • B. Check the log files written in the SUM directory subdirectory abap. subdirectory log
  • C. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
  • D. Check the dump size of the database export on disk.

Answer: B,D


NEW QUESTION # 35
......

E_S4HCON2023 Practice Test Pdf Exam Material: https://passleader.testpassking.com/E_S4HCON2023-exam-testking-pass.html